01/12/2009
Olympic Deal For NI Concrete Firm
Specialist concrete developed by a Northern Ireland firm will be used in the construction of a new 80,000-seat Olympic Stadium in London.
Acheson and Glover was chosen to supply 500mm deep hollowcore slabs to main contractor Bryne Brothers, for use in the podium deck surrounding the massive stadium in a contract worth £250,000.
The firm has also been contracted to supply 12 concrete lift caps designed to accommodate a Schindler lift system, as well as two concrete stairwells leading to the main stadium.
The unusual 500mm slabs and 250 mm slabs are specially designed to cope with cherrypicker loadings to allow access to the structure during the long construction period, due for completion in 2011.
Sales manager for Acheson and Glover, Tim Butler, said: "Acheson and Glover was the only company in the UK able to supply the 500mm deep hollowcore slabs which are specially designed to take extra-heavy loads - up to 25 kilo newtons per square metre.
"In addition to supplying 250 square metres of the 500mm slabs, we provided 4,250 square metres of 250mm slabs, all of which are capped to prevent the concrete going into the cores."
Mr Butler added that the slabs were fitted with an Acheson and Glover fitting clamp to enable quick and easy installation, with no soffit damage normally associated with the traditional methods of placing hollowcore planks with chains, while the precast stairs above the podium were designed for easy removal at a later stage.
The main stadium is located south of the Olympic Park on an 'island' site, while the overall construction site stretches from Stratford to Hackney Wick.
Over 50,000 seats in the lightweight steel and concrete upper level of the stadium will be removed after the 2012 Games, leaving the stadium with a permanent 25,000 seat athletics venue in the permanent lower tier.
(PR/BMcC)
Acheson and Glover was chosen to supply 500mm deep hollowcore slabs to main contractor Bryne Brothers, for use in the podium deck surrounding the massive stadium in a contract worth £250,000.
The firm has also been contracted to supply 12 concrete lift caps designed to accommodate a Schindler lift system, as well as two concrete stairwells leading to the main stadium.
The unusual 500mm slabs and 250 mm slabs are specially designed to cope with cherrypicker loadings to allow access to the structure during the long construction period, due for completion in 2011.
Sales manager for Acheson and Glover, Tim Butler, said: "Acheson and Glover was the only company in the UK able to supply the 500mm deep hollowcore slabs which are specially designed to take extra-heavy loads - up to 25 kilo newtons per square metre.
"In addition to supplying 250 square metres of the 500mm slabs, we provided 4,250 square metres of 250mm slabs, all of which are capped to prevent the concrete going into the cores."
Mr Butler added that the slabs were fitted with an Acheson and Glover fitting clamp to enable quick and easy installation, with no soffit damage normally associated with the traditional methods of placing hollowcore planks with chains, while the precast stairs above the podium were designed for easy removal at a later stage.
The main stadium is located south of the Olympic Park on an 'island' site, while the overall construction site stretches from Stratford to Hackney Wick.
Over 50,000 seats in the lightweight steel and concrete upper level of the stadium will be removed after the 2012 Games, leaving the stadium with a permanent 25,000 seat athletics venue in the permanent lower tier.
(PR/BMcC)
Related Northern Ireland Business News Stories
Click here for the latest headlines.
10 August 2016
Economy Minister Wants To Transform NI Into Globally Competitive Economy
Economy Minister Simon Hamilton has said that he wants to transform Northern Ireland into a globally competitive economy. The Minister made the comments during a visit to Moore Concrete Products Ltd in Ballymena.
Economy Minister Wants To Transform NI Into Globally Competitive Economy
Economy Minister Simon Hamilton has said that he wants to transform Northern Ireland into a globally competitive economy. The Minister made the comments during a visit to Moore Concrete Products Ltd in Ballymena.
20 October 2009
Hospital Building Work Boosts Economy
The construction of the new, state of the art £270m acute hospital near Enniskillen, is estimated to sustain as many as 850 jobs on site of which 200 will be 'new' by the time it opens in 2012.
Hospital Building Work Boosts Economy
The construction of the new, state of the art £270m acute hospital near Enniskillen, is estimated to sustain as many as 850 jobs on site of which 200 will be 'new' by the time it opens in 2012.
12 January 2011
Primary Schools Bid For Outside Space
Primary schools across NI are being invited to test their creative skills with the chance to win a professionally designed and installed outside space for their school worth up to £10,000. One of NI's leading concrete products manufacturer Acheson & Glover has joined together with the Landscape Centre in Ballyclare and U105.
Primary Schools Bid For Outside Space
Primary schools across NI are being invited to test their creative skills with the chance to win a professionally designed and installed outside space for their school worth up to £10,000. One of NI's leading concrete products manufacturer Acheson & Glover has joined together with the Landscape Centre in Ballyclare and U105.
20 April 2011
Concrete Deal Paves The Way For Future Sales
Northern Ireland concrete products manufacturer Acheson & Glover is supplying paving to one of the largest residential developments in south Dublin in a contract potentially worth €750,000 in future sales to the Co Tyrone based company.
Concrete Deal Paves The Way For Future Sales
Northern Ireland concrete products manufacturer Acheson & Glover is supplying paving to one of the largest residential developments in south Dublin in a contract potentially worth €750,000 in future sales to the Co Tyrone based company.
22 August 2011
Export Success For Armagh Concrete Business
An Armagh-based company Concrete Batching Systems Ltd has secured a £100,000 contract in Nigeria with support from Invest Northern Ireland - also creating six new jobs in the process.
Export Success For Armagh Concrete Business
An Armagh-based company Concrete Batching Systems Ltd has secured a £100,000 contract in Nigeria with support from Invest Northern Ireland - also creating six new jobs in the process.
-
Northern Ireland WeatherToday:After a dry start this morning rain will spread from the northwest across all parts. This afternoon will be dull with some patchy rain and drizzle. Becoming much milder through the afternoon. Maximum temperature 11 °C.Tonight:A cloudy evening and night with a little light rain or drizzle, perhaps some clear periods developing along the east coast. A very mild night everywhere. Minimum temperature 10 °C.